不固化半流淌性比401胶差的胶的胶

什么胶水固化不硬_百度知道还没有帐号? 赶紧
underfill 胶水不固化
UID:39339
在线时间92小时
社区年龄11年3个月
金币652威望13贡献3好评11
=561) window.open('http://bbs.smthome.net/attachment/Mon_39_be2a2b.jpg?76');" style="max-width:561" onload="if(is_ie6&&this.offsetWidth>561)this.width=561;" onerror="src='images/nopic1.gif'" original="http://bbs.smthome.net/attachment/Mon_39_be2a2b.jpg?76"
> & 在公司的NPI 过程中,时常会遇到胶水不固化的现象,不固化的地方为BGA 中间一小部分,检查profile board ,profile 都没有问题。胶水也没有过期。上传几张照片希望大家帮忙分析下。造成不固化的原因是什么? =561) window.open('http://bbs.smthome.net/attachment/Mon_39_3bac9.jpg?77');" style="max-width:561" onload="if(is_ie6&&this.offsetWidth>561)this.width=561;" onerror="src='images/nopic1.gif'" original="http://bbs.smthome.net/attachment/Mon_39_3bac9.jpg?77"
UID:39339
在线时间92小时
社区年龄11年3个月
金币652威望13贡献3好评11
上面图片是cross-section
UID:39339
在线时间92小时
社区年龄11年3个月
金币652威望13贡献3好评11
Below is my generalize :Today afternoon , I did some experiments,I list here for your reference .1.Measured the ambient temperature that around the glue which fix at machine ,the temperature is 35 degree .and then we did not do our experiment untill 1.5hours passed with the preheator keep heating ,also the glue hunged above .2.dispensed adhesive onto bare board(took out feb ,15) ,and then placed it on preheator with the setting at 100 degree .after 15min ,Glue appeared incompletely cured ,just like the no curing cross-section in S2000i or S4000 build .then go reflow under the condition of 153 degree peak temperatureAnd 78s above 150 degree .then ,after the reflow ,glue cured .3.Mixed the adhesive with water ,and attached to bare board ,go reflow at 153 degree peak temperatureAnd 78s above 150 degree .then ,after the reflow ,glue cured .But so many voids appeared .-------reference to picture1 .4.Mixed glue with flux and attached to bare board ,then go reflow under the condition of 153 degree peak temperatureAnd 78s above 150 degree .then ,after the reflowThe incompletely curing obviously appeared ,go reflow second times ,it also no curing -----reference to picture 1 and 2.5. Mixed adhesive with less flux compared with step 4,also no curing ,including the the second times .
Generalize the status all of above ,maybe ,we can get below experience .1. &
Moisture just effect the voids ,nothing reflect on the no curing .2. &
2times reflow can help adhesive cured .3. &
Flux play a main role that lead to the adhesive no curing .maybe it is the root cause .but we also need farther confirm about this ..4. &
Higher temperature can help the curing ,for the no curing area only appeared in the center of BGA land pad ,or ,center part exist more flux compare with the outside part
Of the land pad .it need us continuely investigate about this . We also did 3pcs board underfilled this afternoon ,will get the result the following morning .all three boards go reflow under the condition of
153 degree peak temperature And 78s above 150 degre,with the same adhesive which took out from refrigaretor on feb 15.1. &
the first one just go 1 time reflow .2. &
sencond one ,2 times reflow.3. &
third one mixed with flux .[ 此贴被yuxingling在 09:09重新编辑 ]
(1156 K) 下载次数:75
描述: profile
(35 K) 下载次数:45
描述: adhesive
(91 K) 下载次数:68
在线时间1511小时
社区年龄13年3个月
金币550威望266贡献139好评217
那个adhesive怎么啦...做Moisture testing吗...?flux需要after the reflow再testing吧...,在glass上testing可以吗...?E文不好...感觉一个累...,呵呵。
UID:213972
在线时间337小时
社区年龄9年10个月
金币561威望15贡献14好评22
我只有一個疑問?Under fill走迴焊Curing是膠水廠商的建議?還是你們自己覺得這樣比較好?Pass來膠水的Curing要求吧.under fill的BGA返修良率並不好,這受限於under fill品質與返修的衝突.想知道你們選擇的膠水種類...asbl
在线时间131小时
社区年龄13年11个月
金币1721威望11贡献4好评3
现在有在室温下就可以Curing的产品啊,不过可能时间要稍微长些!还有建议楼主不要用英文写你们实验的一些内容!
UID:50499
在线时间92小时
社区年龄11年1个月
金币149威望2贡献2好评0
我觉得是不是中心部位的胶水在你填充时就根本没有填充完全,而在你加热固化的时候刚好起到很好的预热效果才慢慢填充,当然愚见而已,还希望有大侠帮助。
UID:39339
在线时间92小时
社区年龄11年3个月
金币652威望13贡献3好评11
回复3楼 panda-liu 的帖子
underfill 后的几次过炉后,偶尔会发现在中间部位没有固化,但站大部分的其他地方固化完好。1。经测试炉子CPK,正常,profile 在正常范围之内。2。胶水没有过失效日期,也在worklife 内。3。用90度预热5分钟后underfill,实际温度可以达到70度左右。4。胶水量严格控制,每次都用天平称。5。现在基本可以排除和胶水有关,和温度,炉子有关,很有可能和solder paste flux residue 不兼容。因为目前用的是INDUMsolder paste .flux residue 还是比较多。但是有解释不清楚为什么,只出现在BGA中间部位??
UID:39339
在线时间92小时
社区年龄11年3个月
金币652威望13贡献3好评11
回复5楼 flygorden 的帖子
不是室温固化,我发个 profile 看下。
在线时间1511小时
社区年龄13年3个月
金币550威望266贡献139好评217
Process Benefits of Underfill Encapsulants for CSPs and BGAs
Underfill encapsulants were originally developed to encapsulate flip chip ICs. A silicon flip chip has a much lower coefficient of thermal expansion (CTE) than the substrate it is assembled on.By Karl Loh and Edward IbeIn thermal cycling, there is relative movement of the flip chip and the board, resulting in mechanical fatigue and failure of solder joints that electrically interconnect the chip to the board. An underfill encapsulant, typically an epoxy composition, wicks under a flip chip by capillary action, then is cured. It provides mechanical reinforcement to the solder joints, increasing life of the flip chip.Use of underfill encapsulants has proliferated to encapsulation of surface mounted components, such as CSPs and BGAs. These components normally are capable of surviving thermal cycling requirements without being encapsulated, but are not designed to withstand repeated mechanical shock. For example, CSPs and BGAs are used in mobile phones, which are often dropped, and in automotive and military electronics, which must survive years of vibration and/or severe shock. For CSP and BGA underfill encapsulation, the proper encapsulant is easy to handle and process, providing the required reliability. Parameters such as storage conditions, pot life, dispensability, underfill flow speed and cure time are paramount to handling and processing. If board value is high, a reworkable underfill might be used. In such cases, ease of rework is important. Void-free encapsulation, drop test life and thermal cycle life are important issues in reliability of handheld devices. For mobile phones, since the printed circuit board (PCB) is directly under the keypad, keypad actuation is important. For automotive and military electronics, vibration and more severe thermal cycling become critical. This article focuses on processability. Storage ConditionsTraditional flip chip underfill encapsulants must be stored at -40°C. This often is inconvenient for the typical surface mount operation, where the coldest storage facility typically is a refrigerator operating at 5°C for solder paste storage. BGA and CSP underfill encapsulants can be stored at -5°C with a six-month shelf life. Acquisition of a freezer is required, but -5° C can be achieved even with a low-cost residential freezer. Work is being done to validate extended shelf life in a 5°C refrigerator. Pot Life Pot life is the useful life of an underfill encapsulant after it is removed from the freezer and thawed, typically determined by the ability to dispense uniform quantities at uniform speeds. Thus, viscosity must be stable over the length of the pot life. One definition of end of pot life is the time for viscosity to rise 10 percent. In a typical underfill operation, encapsulant is dispensed onto boards preheated to as high as 90°C in a dispensing chamber that can be as hot as 40°C. At 40°C, an encapsulant with a two-day pot life at room temperature may only have an eight-hour pot life. The shorter the pot life, the smaller the package size needs to be for the contents to be consumed within its usable life. In high-volume operation, this results in frequent shutdowns of the dispenser to change a syringe. With a short pot life material dispensed in a hot chamber, there also is a higher risk of material setting up in the line or in the dispensing needle, resulting in the need for time-consuming cleanup. With a longer pot life material, large cartridges can be used.Dispensability Ease of material dispense affects both productivity and capital cost. Lower-viscosity, lower-density material can be dispensed through a small orifice needle faster and with less pressure than a material with higher viscosity and density. Traditional flip chip underfill encapsulants might have a viscosity of 15,000 cps or substantially higher. Because they are highly loaded with silica filler, specific gravities can be as high as 1.8. Dispensing such a material at high speed and precision requires positive displacement equipment, such as auger pumps or piston pumps.=561) window.open('/articles/smt/thm/th_152998.gif');" style="max-width:561" onload="if(is_ie6&&this.offsetWidth>561)this.width=561;" onerror="src='images/nopic1.gif'" original="/articles/smt/thm/th_152998.gif"
>Figure 1. Comparison of flow rate — flip chip underfill encapsulant vs. CSP underfill encapsulantMany CSPs and all BGAs are substantially larger than flip chips, requiring higher flow rate to achieve comparable throughput. The latest underfill encapsulants designed specifically for CSP and BGA encapsulation have viscosities of 7,000 cps or lower. And because they are not even filled, some have specific gravities as low as 1.1. If shot-to-shot repeatability is not critical, these materials can be dispensed with a simple pneumatic system. To more precisely control shot size, the pneumatic system can be fitted with an economical spool valve. In a spool valve, a rod moves up and down to open and close an orifice. Underfill Flow Rate A CSP/BGA underfill encapsulant has lower viscosity and density than a typical flip chip encapsulant. This allows a CSP and BGA encapsulant to flow much faster, desirable since the volumes to be filled are much larger for a CSP or a BGA. One company*** standardizes the measure of flow rate by measuring the time to flow across overlapping glass slides. Two glass slides are overlapped by an 18-mm distance, separated by a 75-&m gap using shims. The sandwich is placed on a hot plate to heat it to the desired temperature, then encapsulant is dispensed and the time to traverse the 18 mm distance is measured. =561) window.open('/articles/smt/thm/th_152997.jpg');" style="max-width:561" onload="if(is_ie6&&this.offsetWidth>561)this.width=561;" onerror="src='images/nopic1.gif'" original="/articles/smt/thm/th_152997.jpg"
>Figures 2a and b. Effect of board moisture. Wet boards create voids during underfill cureIn Figure 1, the flow rate of a flip chip underfill encapsulant is compared with that of a CSP/BGA encapsulant, showing that lower viscosity and specific gravity indeed improve flow rate. In this comparison, at 90°C it takes 50 percent less time to traverse an 18-mm distance. This improved flow rate is critical to maintaining high line speed and productivity.Void-free EncapsulationFactors that affect the presence of voids include moisture in the board or component, flow profile of the encapsulant, and flux compatibility. Moisture trapped in a board or component can evolve during underfill curing, typically performed well above 100°C. Figure 2 compares the encapsulation of a BGA whose board has not been dried and the encapsulation of a BGA whose board has been pre-baked at 125°C for four hours. Many voids are seen with the unbaked board (a), while none are seen with the pre-baked one (b). =561) window.open('/articles/smt/thm/th_152996.jpg');" style="max-width:561" onload="if(is_ie6&&this.offsetWidth>561)this.width=561;" onerror="src='images/nopic1.gif'" original="/articles/smt/thm/th_152996.jpg"
>Figure 3. Underfill flow fronts. Flat flow front reduces risk of voids.Flow profile also affects the possibility of a void appearing. In Figure 3, the flow profiles of two underfill encapsulants are compared. Encapsulant flows from right to left, with the leading edge of flow visible. In the image on top, the flow front is flat, conducive to void-free encapsulation. In the image on the bottom, the flow front is wavy. Fingers can close on each other to form voids.=561) window.open('/articles/smt/thm/th_152994.jpg');" style="max-width:561" onload="if(is_ie6&&this.offsetWidth>561)this.width=561;" onerror="src='images/nopic1.gif'" original="/articles/smt/thm/th_152994.jpg"
>Figures 4a and b. Underfill/flux compatibility. Good compatibility yields void-free encapsulation.In Figure 4, components are attached with two different no-clean solder pastes. In one case, voids can be seen adjacent to the solder bumps. In the other case, the encapsulation is completely void-free. Although voids are rather small, those that bridge two adjacent solder bumps can be catastrophic. If the component is subjected to a subsequent reflow operation, the solder can flow and traverse the bridge, resulting in a short circuit. Curing TimeNewer CSP/BGA encapsulants can be cured in an inline oven or a converted solder reflow oven in five minutes or less. Curing of an underfill encapsulant can be measured by the use of a dynamic scanning calorimeter (DSC). A DSC measures the amount of heat released. When heat is no longer released, the reaction has stopped. A follow-on DSC analysis at higher temperatures will confirm whether or not the material is fully cured. Additional curing taking place at higher temperatures would indicate that the original cure schedule was inadequate. Gradual temperature ramps are recommended, as rapid ramping of temperature to cure temperature and rapid cooling can cause excessive stress on an assembly. ReworkabilityUnlike flip chip assemblies, which often are single-chip packages, CSPs and BGAs are most often assembled on multi-component assemblies that can be of high value. If an underfilled component is found to be faulty, rework is required. With a conventional flip chip underfill, attempts to remove the component will damage the board and/or the solder pads. For this reason, reworkable underfills have been developed. One development is a reworkable underfill that becomes soft and loses adhesion at 200° to 220°C. When heated to that temperature, which is also above solder reflow temperature, the component is easily removed and underfill residues are scraped off without damage to the soldermask and solder pads. Then, using conventional rework tools (soldering iron, solder wick and hot air gun) the solder pads are cleaned and prepared for attachment of a new component.=561) window.open('/articles/smt/thm/th_152999.gif');" style="max-width:561" onload="if(is_ie6&&this.offsetWidth>561)this.width=561;" onerror="src='images/nopic1.gif'" original="/articles/smt/thm/th_152999.gif"
>The table compares properties of a traditional flip chip underfill with those of two CSP/BGA ones, one a non-reworkable underfill and the other a reworkable one. Regarding uncured properties, no filler in the CSP/BGA underfills results in lower viscosities and specific gravities, resulting in easier dispensing and faster underfill flow. They also have longer pot lives at room and elevated temperatures. With respect to the cured properties of the non-reworkable CSP/BGA underfill, glass transition temperature need not be sacrificed compared to the however, there is a substantial increase in the CTE. Commercial flip chip underfills have CTEs ranging from 20 to 40 ppm/°C. At 60 ppm/°C, CTE far exceeds what is typically desirable in a flip chip application. Regarding cured properties of the reworkable underfill that is commercially used in the manufacture of mobile phones and military electronics, the material has a lower glass transition temperature as well as a higher CTE. To attenuate these properties for applications with more severe thermal cycle requirements, a silica-filled version is available with reduced CTE.ConclusionAn underfill designed specifically for CSP/BGA encapsulation can provide significant benefits in processability and productivity. The absence of silica broadens the formulating latitude, allowing the manufacturer to offer a material that is easy to store, with long pot life, yet one that also cures rapidly in an inline oven. The absence of filler also reduces viscosity and specific gravity, resulting in substantially improved dispensability and flow rate. A tradeoff is made in cured material properties, specifically a higher CTE. Reworkable underfills also are available that offer similar process benefits. *X6-82-5LV** X13563*** Zymet Inc. Karl Loh and Edward Ibe may be contacted at Zymet Inc., East Hanover, NJ 07936, (973) 428-5245; E-mail:
and . SMT July, 2004Author(s) : & Edward Ibe & Karl Loh
UID:39339
在线时间92小时
社区年龄11年3个月
金币652威望13贡献3好评11
还是panda-liu profession
UID:39339
在线时间92小时
社区年龄11年3个月
金币652威望13贡献3好评11
At 40°C, an encapsulant with a two-day pot life at room temperature may only have an eight-hour pot life. 上面这句话不理解啊,应该是这样把:At 40°C, an encapsulant with an eight-hour pot life at room temperature may only have
a two-daypot life.[ 此贴被yuxingling在 12:50重新编辑 ]
(161 K) 下载次数:29
UID:24699
在线时间170小时
社区年龄11年6个月
金币4威望6贡献0好评
现在有在室温下就可以Curing的产品啊,不过可能时间要稍微长些!还有建议楼主不要用英文写你们实验的一些内容!
在线时间1511小时
社区年龄13年3个月
金币550威望266贡献139好评217
原帖由11楼楼主 yuxingling 于 22:57发表 At 40°C, an encapsulant with a two-day pot life at room temperature may only have an eight-hour pot life. 上面这句话不理解啊,应该是这样把:At 40°C, an encapsulant with an eight-hour pot life at room temperature may only have
a two-daypot life.拣了人家现成的...看看对Pot Life的解释...,呵呵。Pot Life Pot life is the useful life of an underfill encapsulant after it is removed from the freezer and thawed, typically determined by the ability to dispense uniform quantities at uniform speeds. Thus, viscosity must be stable over the length of the pot life. One definition of end of pot life is the time for viscosity to rise 10 percent. In a typical underfill operation, encapsulant is dispensed onto boards preheated to as high as 90°C in a dispensing chamber that can be as hot as 40°C. At 40°C, an encapsulant with a two-day pot life at room temperature may only have an eight-hour pot life. The shorter the pot life, the smaller the package size needs to be for the contents to be consumed within its usable life. In high-volume operation, this results in frequent shutdowns of the dispenser to change a syringe. With a short pot life material dispensed in a hot chamber, there also is a higher risk of material setting up in the line or in the dispensing needle, resulting in the need for time-consuming cleanup. With a longer pot life material, large cartridges can be used.使用寿命  使用寿命是指底部填充剂从冷冻条件下取出后可有效使用的时间。有效使用是指在一定的点胶速度下可保证的点胶量的连续性及一致性。因此在整个使用寿命中其粘度必须稳定。比如Zymet在界定产品的使用寿命时确定为粘度上升了10%的时间范图1为不同产品的粘度一时间范围。  通常,倒装芯片的底部填充剂的使用寿命只有8小时,最多2天。CSP/BGA的底部填充剂可以有5天或更长的使用寿命。然而,在典型的底部填充操作中,胶粘剂涂在已经预热至90℃的线路板上,意味着点胶管内的温度可能达到40℃。因此,真正的工作寿命应该足在40℃时或者容器处于40℃条件下的使用寿命。可以有2天使用寿命的胶水,在40℃时也许只有8小时的使用寿命。那么较长的使用寿命为何如此重要呢?使用寿命越短,包装就越小。因此,使用寿命短的产品,就只能使用10CC或30CC的包装,以便在短时间内用完。在高产量的工艺中,这将导致频繁更换针筒,而每一次的更换都有可能引入空气;此外,较短使用寿命的胶水在热胶头内容易硬化,导致不得不进行耗时的清洗。较长寿命的胶水则可以使用大包装,在1天或数天内不需更换,从而提高产量,减少次品。[ 此贴被panda-liu在 19:33重新编辑 ]
(196 K) 下载次数:35
访问内容超出本站范围,不能确定是否安全
Total 0.247978(s) query 0, Time now is: 09-11 03:04, Gzip enabled, Copyright &
Discussion Group, all rights reserved. Powered by PHPWind,

我要回帖

更多关于 流淌性比401胶差的胶 的文章

 

随机推荐