内简单装修协议书怎么写工程英文怎么写

土建装修工程师英文个人简历
土建装修工程师英文个人简历
&&&&来源:英文简历
Resume number:
Updating date:
10:49:37 no photo
Name: Mr. Wang Nationality: China (Mainland)
Current Place: Dongguan Height/Weight: 176 cm?64 kg
Marital Status: Single Age: 28 years
Career Objective
Application type: Jobseeker
Preferred job title: Conveyance System Engineer: Decoration Engineer 、 Construction Management / Project Manager: Civil Engineer 、 Structural / Bridge & Alignment / Bridge & Alignment Engineer: Civil Engineer
Working life: 3 Title: primary title
Job type: Full time Expected Start date: In two weeks
Expected salary: ¥5,000--¥8,000 Preferred working place: Guangdong province
Work experience
Company's name: Guangdong Hongfa Investment Group Co., LtdBegin and end date: 2-09
Enterprise nature: Private enterprisesIndustry: Real Estate / Construction
Job Title: Decoration Engineer
Job description: Dongguan Hongfa Building,
Block south of the Longquan International Hotel has been built, the east had been built for the construction companies in southern China, north of the proposed joint good for planning high-rise residential buildings to the west of the city government for planning to do two multi-storey buildings. Hongfa building works to a 20-story building as the main body, and three-layer (local 4-layer) skirt, and two basement connected into a single whole. Hongfa Building, a five-star standards with refined decoration.
Building, 17 ~ 21 layers of fine decoration (including the 21-layer fill board) to assist the project manager dealing with the company and external coordination. Tracking the final acceptance and final acceptance, are mainly responsible for dealing with wall leakage and property of entities and information on the transfer of work.
Reasons for leaving: no leaving yet
Company's name: Dongguang Dingfeng Real Estate Development Co., LtdBegin and end date: 8-02
Enterprise nature: Private enterprisesIndustry: Real Estate / Construction
Job Title: Assistant Civil Engineer
Job description: International Plaza, Dongguan City, Copas
This project is implemented by three towers and two-story commercial podium composed of main building portion of a 26-storey office building and two 18-storey residential, first and second floor of shopping malls and office services, facilities, and underground floor for parking library, underground two-story underground garage for the wartime and peacetime use of civil air defense, with a total floor area of 86,395.82 square meters.
Project Duties: internship period of 3 months is responsible for collection of data, 3 months later became responsible for C buildings of the main work (construction) to assist the project manager to deal with the company and external coordination.
Reasons for leaving: Transferred to the Group on
Educational Background
Name of School: South China Agricultural university
Highest Degree: Bachelor Date of Graduation:
Name of Major 1: Civil Engineering Name of Major 2: &
Education experience:
Start date End date Education organization Majors Certificate Certificate No
2003-09 2007-07 South China Agricultural university Civil Engineering Bachelor &
Language Ability
Foreign Language: English Level: excellent
Language ability: master the use of the Chaozhou-Shantou
Chinese level: perfect Cantonese Level: perfect
Relevant skills and abilities
& MY University, cum laude, communication ability, junior took second-class scholarship, freshman, senior took third-class scholarship. Familiar with the foundation, the main body, 5-star fine decoration management are familiar with the use of office, project, CAD, Guangsha CAD, PS and basic SketchUp, 3DMAX such an operation. In the out of work, belongs to Ding Feng International Plaza, projects and Hongfa Building project in 2007, the Group also has been rated as excellent group, I was the Group in 2008 as the advanced individual. Familiar with the various processes and project completion and acceptance process.
Personal Hobbies: Basketball, University several times during the seven-up, MOTO performances show large-scale street basketball experience, the participation of Ding-feng team won in 2008 Hongfa Investment Group runner-up basketball games.
Self-recommendation letter
& I pay attention to the collective sense of honor, easy to get along with others, work a serious and responsible, work hard, work stress tips. At present the pursuit of challenging, developmental and learning-oriented work (including the accumulation of knowledge and experience).
与土建装修工程师英文个人简历相关的文章
相关内容推荐:装修装饰工程施工合同(中英文)
Translated from Chinese to English
&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&
Owner& (Hereinafter referred
to as party A)
Contractor: (hereinafter called
party A intends to make
building, through bidding procedure, award this project hereby to
party B for construction and completion thereof.
party B is with the qualification of decoration engineering,
intends to accept bidding conditions and consent to undertake the
project construction and complete.
parties hereto agree to execute this contract in accordance with
LAW OF CONTRACT, REGULATIONS OF CONSTRUCTION DECORATION MANAGEMENT,
ADMINISTRATION RULES FOR INDOOR HOME DECORATION and concerned laws
and regulations.
THEREFORE in consideration of the mutual promises, assertions and
covenants herein and other good and valuable considerations, the
receipts of which is acknowledged hereby, the parties hereby agree
as follows:
Work Overview
& &&Project
& &&Project
Contracting Means: General contracting, including
contracting of materials and labor, liabilities of quality, work’s
safety and work’s schedule.
Contracting contents include all works of demolishment and
modification, which should be subject to Construction
Quotation.
Project Period
period hereof is from the date of commencement of &&&&to
the date of completion of &&&&&.
Approval of Project and Qualification of Construction
1,包括消防手续。
otherwise provided herein party B agree to process all formalities,
which are related to this decoration, of the approval, registration
and acceptance in addition to fire protection.
hereby warranty that its execution qualification conform to this
project requirements and none of decoration works hereunder, which
are awarded by party A, are beyond the scope of party B’s
Certification of Qualification.
Project Cost and Payment
1& The cost of this
project is &&&&Yuan
Payment by
after party B’s completion of all decoration works on schedule and
making acceptance by party A pursuant to the stipulation of Article
8, party A will , within 30 days of receipt of formal invoice from
party B, effect payment in a lump sum of all project amount in
accordance with actual completion of works and bidding unit
2时,须由乙方编制增减工程预算书,经甲方审核确认后,在相应的工程进度款付款时予以结算支付。
that larger increase or decrease of quantity due to design
modification and / or party A’s requirement thereof, should be
subject to party B’s preparation of engineering budget for the
increase or decrease of quantity, which should be reviewed and
examined by party A before payment of project progress be settled
an paid correspondently.
will not effect payment until and unless party B have provide the
formal invoice to party A.
Requirements of Project Quality
should, pursuant to in strict the drawings which confirmed by party
A, carry out execution and accept in any time the inspection /
checking by party A’s representative or designated personnel, for
which provide the facilitate conditions. Construction should be
carried out in accordance strictly with State’s norms, satisfy
design requirements, the quality thereof reach the compulsory
standards of construction, other standards concerned and
regulations hereof. Otherwise party A is entitle to require party B
to dismantle and reconstruct the work from which any and all
expense and loss should be undertaken by party B.
project is processed by the means of contracting materials and
labor, respecting to material which should be purchased under party
A named and conform to the requirements of State’s standards and
environmental protection. The materials of decoration and
equipments , which have been eliminated expressly by State is
prohibited to used.
should be take full responsibility for the feasibility and security
of design scheme, if any, &all added expense due
to the unfeasibility and alteration of design, in addition to the
loss or increase expense due to failure of acceptance of fire
protection shall be undertaken by party B.
should conduct the construction pursuant to drawings and can not
make, at its own initiative, modification or amendment of design
atmosphere quality indoor should, after completion of decoration
engineering, conform to the concerned standards issued by State
including STANDARDS OF AIR QUALITY INDOOR and NORMAL OF INDOOR
ENVIRONMENT POLLUTION OF CIVIL CONSTRUCTION.
particular project or special requirement for quality, during
works, being raised by party A , should be subject to the
confirmation by parties hereto and supplementary agreement on the
added cost.
Rights & Obligations of Parties
Rights & Obligations of Party A:
cooperation of processing all necessary work’
permission.
conformation or modification pinion within a reasonable period,
upon receipt of decoration drawings submitted by party
To pay the contract amount to Party B on schedule as
cooperation with other subcontractor which is nominated by party
5To organize the acceptance of project’s
completion.
&&&2Rights & Obligations of Party
1103, , 。如果乙方未能在本条款定期限内提供详细施工报批图纸,则按第七条承担责任。
Party B should, within ten days after this
contract come into effect pursuant to the design requirement,
submit the detail execution drawing for party A and owner for exam
and approval, and within three days upon party A and owner ‘s
submission of amendment opinions provide the altered drawings for
re-exam / approval. Party B should conduct the execution in
accordance with the drawing which have been approved by party A and
owner. Any alteration during the execution should be subject to the
prior consent of party A and owner, in case of failure of the
consent to party B’s construction program, any economic loss
arising therefrom and compensation to owner& shall be undertaken
by party B. The compensation will be deducted directly from the
contract payment, where insufficiency of contract payment, party B
compensation. Provided that party B ‘s failure to provide
detail drawing for approval within the limited period herein, will
assume the corresponding responsibilities under Article Seven
Party B should, prior to commencement through the
negotiation with party A, design a qualified person as party B’s
representative for liaison with party A and make supervision of
contract performance.
with qualified construction personnel. Party A is entitle to
request party B to replace the disqualified personnel and party B
should within &&&&days
replace such personnel upon receipt of the request of party A’s
representative.
4,定期向甲方汇报施工进度情况,按时完工。做好施工安全防范措施,确保施工安全并承担施工造成人身和财产损失的直接赔偿责任。
the management of execution organization, careful construction so
as to ensure project quality, submit the progress to party A at
regular and have completion of project on schedule. Conduct the
precaution of safety on site and ensure safe execution and
undertake the responsibility of direct compensation for any
person’s casualty and property loss due to its
execution.
responsible for the protection of finished products which have been
completed prior to party A’s acceptance, if, any damage during the
protection party B should repair the same on its own account.
Provided that party A use the finished product prior to acceptance
the repair cost of damage will be on party A’s account. However the
delay of work’s period and economic loss due to party B ‘s failure
of performance of aforementioned liabilities shall be
responsibility of party B.
To organize and take park in the acceptance of
completion.
Conduct orderly execution and guaranty that no
construction materials and debris will be placed out of order
around the site, in addition to clear and clean the site after
completion and bear the cost thereon.
Work’s Delay
period may be postponed provided that if the completion day is
delayed due to following reasons which have been confirmed by party
A’s representative.
The design and work’s quantity, which are
requested by party A have been material alteration.
Disruption
time of water and currency supply is more eight hours within one
week due to non party B’s reason.
Force majeure shall refer to
war and disasters.
aforesaid reasons, provided that if failure of completion as the
schedule under contract due to party B’s reason, the responsibility
thereof shall be on party B and party B should effect the payment
of liquidated damages on RMB &&&&for
each delayed day of work period.
Project Acceptance
should, prior to the project with the conditions of cover and
carrying out concealed work, give one day advance notification to
party A for inspection, and can not conduct the concealed work or
continue execution until party A have signed on the acceptance
record. Otherwise party A is entitle to require party B to
dismantle and reconstruct or retain a third party to do the same,
all expenses and losses consequent thereon or incidental thereto,
including the loss of period delay, shall be assumed by party
Party A has right to conduct the phased acceptance
of project, respect to the time of particular acceptance, shall be
subject to party A’s determination.
should, upon project’s satisfaction of the acceptance conditions,
submit the full set of completion materials and report of
and party A should, within five days upon receipt of
all materials submitted by party B, organize the acceptance
thereof, if, overdue time thereof, shall deemed as party A’s waiver
of such right and deemed as qualification of acceptance. Where and
to the extent that project satisfy the quality standards stipulated
in Article Five hereof party A should make signature on the
Acceptance R where fail to conform to aforesaid standards,
party B should, after party A ‘s indication of unconformities,
forthwith conduct rectification or reconstruction and thereafter
resubmit the completion materials and acceptance report, any delay
and loss occurred therefrom shall be undertaken by party
Warranty Period and Warranty Scope
Party B’s
warranty responsibility of the waterproof engineering will be five
years in addition to two years warranty for wall paintings, and
other warranties will be subject to State’s regulations on
construction warranty. The warranty period commence from the date
on which party A sign Report of Acceptance.
2Warranty Scope
Warranty Period inspect to the project item which is belong to
party B’s work scope, where whatever damage or loss occurred due to
the execution quality and/or material use, party B should make
repair where such damage due to party A’s
improper use of project, party B only recover the fees of materials
and labor. Party B should, where any quality defect of decoration
in the Warranty Period, make repair in time on party A’s request
thereof and undertaken the cost therewith and party B shall, on and
from two years thereafter, provide the continue service of repair
and recover the cost on the market price.
Breach Liability
that the failure of party A’s representative to give the necessary
direction, conformation and approval, to perform its various
liabilities as per the stipulations hereof and failure to effect
the payment of project cost, and/or conduct other acts which are
make this contract unable to be fulfilled, party A should assume
the breach liability consequent thereon or incidental thereto in
addition to the corresponding postponement of work
Provided that party B fails to make completion as
set in contract or its Work’s quality fail to satisfy the
requirements of design and norms, or its other acts which make
contract unable to be performed, party B should assume breach
liability therefrom, and effect payment of liquidated damages
pursuant to contract provision, in addition to the loss arising out
of its breach. Provided that if party A’s property loss or
personnel dead / injury due to party B’s reasons which are included
but not limited design defect and failure of Work’s quality to
satisfy the requirements hereof, party B should undertake the
responsibility of compensation thereof.
Disputes Settlement
divergence or dispute arising out of or in connection with this
contract should be tried to settlement by the amicable negotiation
of parties hereto. If failure of negotiation any party can submit
the dispute to China International Economic and Trade Arbitration
Commission for arbitration which are final and binding to parties
Entry Into Force and Copies
Contract will become effective upon the signature / seal of parties
hereto, any outstanding issue hereof will be settled by negotiation
of parties hereto. Two copies of original contract for each party
hold one copy with equally authentic.
& Approved
&&REQUIREMENTS OF WALL’S
GRANITE, GYPSUM BOARD AND CEILING
Owner(Seal):&
Representative
of Party A (Signature):
Contractor
Representative
of Party B(Signature):&
&&&&&&&&&&&&&
construction measure for outer walls granite
1.1Do the detail master drawing of construction
50MMBefore the panel of veneers installation, should follow the requirements of
the building design drawing, verified the physical dimension of
installing position of the decorations panel and deviation
situation conscientiously at first. For example, vertical degree,
roughness and the matrices of wall the size that is increased and
decreased. Then work out the amended drawing. There should
reconfigure the board if the difference go beyond the allowed
deviation. And this reconfiguration should base on the premise that
matrices and distance of surface of decorations panel are not
smaller than 50MM.
1.2Dealing with the basic layer
The seam width for the granite
board should be 1MM.
Surveying and putting the
Follow the
building design drawing to mark the installed line on the
wall,& and
guarantee the size to be correct.
1.4Check the granite on site
granite board enter into the site, first of all, check every piece
if have broken or changing color or part polluted and lack arris
and then pick out all these p On the other
hand, for the decorations panel which meet the requirements, should
measure the corner vertically, the roughness, and the crack, and
should guarantee the size after installing.
The broken
granite board, we can paste it with epoxy resin adhesive. While
mending, the surface should be clean and dry. The two
conglutination surface scribble thickness should
0.5mm glue conjunctiva
layer, paste in
environment, and in
the same temperature to maintain.
1.5Select the board, Piece together in advance,
Dispatch number
geometric size according to the board which have serial number, and
sort out according to the error size.
together the board in advance base on the selected
The boards
which have been pieced together should be marked number, and then
piled up vertically as class.
1.6General requirement for the installation of
width of panel design of the decoration have no requirements,
should accord with the regulations of relevant norms. Adorn panel
installation, should take fixed measure temporarily hang frank, in
order to prevent the displacement of board while pouring into
mortar. The decorations panel is installed, can pad the chuck to
adjust according to the width of sewing. Should also guarantee
outer surface is levelled, vertical and the board one is suitable
for reading and suitable and flat.
2 Construction method of the light weight partition
partition wall of this project adopts the light-weight steel joist
gypsum board, its craft installation as follows:
Because of
the gypsum board’s fragility, the bad& water-proof , and
easy to damage, apt to pollute, and also difficult to repair. We
should arrange for the building construction to be fitted up
rationally, hot-water heating, electric, ventilates process, create
conditions for protecting the finished product.
The procedure
line for the wall after the structure is confirmed----the
construction of wall base-----install the ground joist structure
and shed joist structure------ Fix various entrances cave and
doors---- Install one side gypsum board----- The water and
electricity pipe piercing through the line and
confirming------install another side gysum board------the joint
work-----Connect fixed apparatus, electric----the decoration for
wall----Construction for skirtings
The key requirements for
installing joist structure
fixed along the ground, along carrying joist and frame joist in the
position of line according to playing, the sideline of joist should
be with playing the line coincidently. The tip of joist should be
fixed and firm, the intervals of fixing point of the joist and
matrices are not greater than 1m
be vertical to install joist of verticality, the interval of joist
should accord with the designing requirement.
2.7400-600mm20-25mm
installing and supporting joist, should support and block
installing in the opening direction of joist of verticality first,
the card distance should be 400-600mm, the distance from both ends
of joist should be 20-25mm.
2.8The installation of gypsum
installing the gypsum board, we should check the firm intensity of
joist structure, and should be to burying the pipeline in the wall,
packing materials and enclosing the apparatus of the wall to take
the part to strengthen the measure relevantly in advance, confirm
and go through formalities of examining latently, only after that ,
can seal the board.
should be installed under no stress, can't
suppress to take place. And installing should turn towards the
middle part all around fixedly
The gypsum
board should stagger the seam, the horizontal seam of board in the
two sides of partition wal The seam of two
sides of the wall can't be left on the same joist. All places where
we can adopt total length of the gypsum board in fact, should avoid
that there is seam, can fixed in order to combine and then hole
2.113mm6mm
installing the gypsum board, the board and matrices around should
be identical fluffily, should leave
3The key requirements for installing
the ceiling
to guarantee to hang integrality of veneer and installation
dependability, while confirming the location line of joist, need it
according to the size specification of the aluminium alloy board
And hang area size that carry to arrange for and hang the physical
dimension of a joist structure The size to the board veneer of
aluminium alloy is assigned the requirement: Ones that make up
plate pattern is the intact, it stay all around when it stay size
take it symmetrical or even.
alloy board and light steel joist installation of joist structure,
mainly adopt the hanging type of clivers or specialize in the fixed
type of tapping screws, can also adopt the copper wire to pitch and
according to play good plate arrange, assign line, begin to be
installed from a direction sequentially. Notice the cliver
connecting with joist first fixedly, and then hook the aperture by
the side of plate .The aluminium alloy board should handle in
installation with care, is not damaged or scratched the fender.
While specializing in tapping screws and fixing, should have the
screw after getting into and typing the location of hole with
electric portable drill.