预应力管桩断桩处理的原因是什么

断桩原因分析
analysis of pile breaking causes
断桩原因分析
基于1个网页-
通过工程试验,提出高强预应力混凝土管桩在砂性地基中静力压桩压桩力,并分析产生断桩的原因。
Through engineering trials, this paper brought forward the static installation pressure of PHC piles in sandy soil, and analyzed the reasons why PHC piles were caused to rupture.
本文通过实例分析了在深基坑工程中,由于基坑回弹导致钻孔灌注桩断桩的原因,并提出了预防措施。
In this paper, the causes of rebound foundation pit result in the crack in the foundation pile were analyzed through the engineering case, and the preventive measures were proposed.
文章就该工地桩基质量差的原因进行了主观、客观分析,并提出了减少和避免断桩、缩径桩的建议。
This paper makes subjective and objective analysis of the cause of the poor quality of the pile foundation. Recommendations to decrease and avoid the pile cut-off and shrinking-diameter piles$…
$firstVoiceSent
- 来自原声例句
请问您想要如何调整此模块?
感谢您的反馈,我们会尽快进行适当修改!
请问您想要如何调整此模块?
感谢您的反馈,我们会尽快进行适当修改! 上传我的文档
 下载
 收藏
该文档贡献者很忙,什么也没留下。
 下载此文档
正在努力加载中...
预应力管桩在淤泥层断桩原因分析及处理建议
下载积分:872
内容提示:预应力管桩在淤泥层断桩原因分析及处理建议
文档格式:PDF|
浏览次数:8|
上传日期: 16:33:40|
文档星级:
该用户还上传了这些文档
预应力管桩在淤泥层断桩原因分析及处理建议
官方公共微信  ①使用了厂家生产的未经检验的不合格的桩;
  ②桩尖碰到地下障碍物管桩被蹩断;
  ③管桩施工中垂直度没有控制好;
  ④管桩由软弱土层突然进入硬土层,桩机压力迅速升高,桩身受到瞬间冲击力而引起;
  ⑤基坑施工中,由于软土推挤隆起,基坑壁侧向移动造成断桩。
  施工中若发现有断桩,就要采取补强加固方案处理。对预应力管桩浅层断桩可采用接桩。对深层断桩的接桩(包括部分错位桩纠偏后接头)要抽干桩内积水,确认桩的倾斜在允许范围内,放人钢筋笼,钢筋笼应伸到断桩下3m,用高等级混凝土灌注。接桩后要进行承载力检测。当断桩处错位,无法复原时,应重新补桩。对工程事故应分析问题的原因、补桩的可能性和对已施工桩的影响,考虑其它可利用条件以及经济和工期等要求。 责任编辑:风聆
延伸阅读:
收藏分享:
&&&&&&&&&&
4大班次+2-3套全真模拟题提升学习效果
4大班次+2-3套全真模拟题+1套预测试题
3套全真模拟题+2套预测试题+考前冲关宝典
3套模拟题+3套预测题+考前冲关宝典+考前重点
以知识点为单元授课练习,强化重点、难点、考点
  1、凡本网注明“来源:建设工程教育网”的所有作品,版权均属建设工程教育网所有,未经本网授权不得转载、链接、转贴或以其他方式使用;已经本网授权的,应在授权范围内使用,且必须注明“来源:建设工程教育网”。违反上述声明者,本网将追究其法律责任。
  2、本网部分资料为网上搜集转载,均尽力标明作者和出处。对于本网刊载作品涉及版权等问题的,请作者与本网站联系,本网站核实确认后会尽快予以处理。
  本网转载之作品,并不意味着认同该作品的观点或真实性。如其他媒体、网站或个人转载使用,请与著作权人联系,并自负法律责任。
  3、本网站欢迎积极投稿。

我要回帖

更多关于 预应力管桩断桩处理 的文章

 

随机推荐