schedule yearly exams怎么读?

schedule是什么意思_百度知道& schedule
英语: schedule 
大词典A大词典B大词典C
['skedʒul]n.时间表, 一览表, 计划 v.预定, 安排, 编制目录
例句与用法:
He was bidden to finish the work on schedule.
我要他按时完成工作。
We've already finished the work anterior to the schedule.
我们已经提前完成了工作。
His busy schedule made him completely inaccessible to his students.
他的时间排得很满,学生根本无法和他接触。
Our schedule went completely off the rails during the strike.
我们的预定计画在罢工期间完全被打乱了。
The staff don't mind the new work schedule but they would jib at taking a cut in wages.
全体工作人员对新工作时间表倒不介意,但不同意削减工资。
He could have finished it on schedule, but somehow he fell behind.
他原本能按预定进度做完这件事的,但不知怎地却落后了。
The meeting is scheduled for Thursday.
会议定于星期四举行。
The project was completed ahead of the schedule.
这项工程提前完工。
词形变化:
英英解释:名词 schedule:
a temporally organized plan for matters to be attended to
an ordered list of times at which things are planned to occur
动词 schedule:
plan for an activity or event
plan the time and place for eventsschedule的解释_schedule是什么意思_schedule在线翻译_在线背单词schedule_schedule的读音_schedule的例句_在线背英语单词_小精灵儿童网站
schedule&['ʃedju:l; 'skedʒjul] n.时间表, 进度表v.确定时间
 今日热词: - 刚 |
单词搜索:
背单词 schedule
单词认知/跟读练习/词义回想/单词回想/字母填空/听写练习/选择练习/默写练习/单词测试(初中高)
单词 schedule 网络释义
名词 n. [C]
1.表;清单;目录
Have you got a schedule of postal charges?
你有没有邮资价目表?
2.【美】时间表;课程表;(火车等的)时刻表
The teacher posted the schedule of classes.
教师将课程表公布出来了。
3.计划表;日程安排表
They have planned a tight schedule of travel.
他们安排了一个紧凑的旅行日程。
及物动词 vt.
1.将...列表(或清单等)
2.将...列入计划(或时间)表
3.【美】安排,预定[H][+to-v]
The delegation is scheduled to arrive tomorrow.
代表团定于明日到达。 单词 schedule 其它相关单词解释
n. 时间表,一览表,计划表,议事日程
vt. 预定,编制目录,制...表,安排
plan or list of times when something will happen, be done, etc.
My schedule for next week is very tight.
  我下周预定要做的事排得很紧。
What's your schedule for tomorrow?
  你明天的日程安排如何?
He always has a full schedule.
  他的时间表一向排得很紧。
The train was in an hour behind schedule.
  火车误点一小时到达。
The meeting is scheduled on Friday.
  会议安排在星期五。
The plane is scheduled to take off at 4.
  飞机定于四时起飞。
The train arrived on schedule.
  火车正点到达。
What is on the schedule (for) today?
  今天预定要做的事是什么?
a publishing schedule 出版预定[计划]表
a class schedule 课程表
a schedule of charges 收费表
one's work schedule 工作预定表
a train schedule 火车时刻表
on schedule 按照预订时间
ahead of schedule 提前
according to schedule 按照预订计划
behind schedule 落后于预计时间
复数: schedules
同义词:list, catalogue, index, timetable, program, calendar, post, slate
反义词:disorder
单词 schedule 其它例句
- finished the project on schedule.
  按计划完成工程项目
- He was bidden to finish the work on schedule.
  我要他按时完成工作。
- a schedule of guided tours.
  汽车时刻表;导游时间表计划进度安排,planning schedule,音标,读音,翻译,英文例句,英语词典
说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置: ->
-> 计划进度安排
1)&&planning schedule
计划进度安排
2)&&schedule planning
进度计划安排
Construction schedule planning is very important in project management.
并为同类工程的进度计划安排建立了科学的模型,对其它类别的工程进度计划安排提供了可行的借鉴。
3)&&schedule
[英]['?edju:l]&&[美]['sk?d?ul]
时间表,进度表,调度[表],表,目录,图表,日程表,安排,计划表,进度计划
4)&&plan and arrangement
5)&&schedule plan
Research of Schedule Plan and Schedule Control of Fire System of Jingshui B
晶水大厦消防工程项目进度计划与控制研究
This article expounds the making of schedule plan and schedule control according to the practical application of P3 in Zhuzhou Navigation Lock project,so as to reveal to the engineering administrators the application method of P3 and main ideas and methods of engineering project administration reflected by P3.
结合P3在株洲船闸工程项目的应用,对进度计划的编制及进度控制作简要叙述,旨在使各级工程管理人员了解如何应用P3,了解P3所反映的工程项目管理的主要思想及方法。
Project network technique is presently a frequently-used method to make project schedule plan.
目前,工程项目进度计划的编制多采用网络计划方法。
6)&&schedule
[英]['?edju:l]&&[美]['sk?d?ul]
we are aiming at establishing a more practical and visible schedule control chart based on Bar Chart and CPM.
通过对影响工程进度的约束事件的分析,在横道图和关键线路网络图(CPM)的基础上,力图建立一种施工现场实用直观的进度计划控制图技术。
How to schedule highway engineering while considering influence of random factors was discussed,then,a new project planning technique considering effect of random factors was presented which classified those random factors and constructed different models to deal with different kinds of random factors using computer simulation technology and program evaluation and review technique(PERT).
对在编制公路工程进度计划时如何考虑气候等随机因素的影响进行了研究,提出了考虑气候等随机因素影响的公路工程动态网络计划方法。
Case study shows that the present method may help to obtain reliable work schedule for projects and the earliest time for each node.
针对给定施工进度风险水平的施工进度计划编制问题,采用当量概率和蒙特卡罗仿真技术,给出了基于一定施工进度风险水平的施工进度计划的编制步骤;运用Delphi7。
补充资料:计划
  计划国家对经济和社会发展的战略、目标、政策、方案等进行的部署和安排。分为经济发展计划和社会发展计划,这里专指前者。
经济计划的主要功能在于协调社会生产比例关系,反映社会生产过程中客观需要,协调社会劳动的要求。计划的分类多种多样:按时间序列划分,有长期计划、中期计划和短期计划;按空间因素划分,有中央计划和地方计划;按社会生产过程划分,有生产计划、流通计划、分配计划和消费计划;按控制方式划分,有指令性计划与指导性计划;按计划范围划分,有宏观计划与微观计划。这些计划之间相互联系、相互制约,构成一个完整的计划体系。
指令性计划国家管理经济的一种形式。是由国家或主管部门或地方机关下达、带有行政强制性和约束力、必须保证实施的计划,它是对国民经济实行直接计划管理的一种具体形式。实行必要的指令性计划,在于保证国家重点生产和建设的需要,有利于保持宏观经济平衡,保证国民经济和社会发展战略目标的实现。指令性计划的范围主要是关系到国计民生的重要产品中需要统一调拨分配的那部分产品以及关系到全局的重大经济活动。
指导性计划由国家或主管部门、地方机关下达的指导经济和社会发展方向,不带有行政强制性的计划。是国家对国民经济实行计划管理的一种具体形式。在市场经济条件下,扩大指导性计划的范围,充分发挥指导性计划的作用,有利于实现国民经济总体素质的提高;有利于企业转换机制,把企业推向市场,使之成为独立的商品生产者和经营者;有利于促使国民经济结构合理,生产要素合理配置,生产力合理布局,实现社会效益、生态效益、经济效益的有机结合。指导性计划实施的核心是经济调节杠杆作用的发挥,各个经济部门主要通过运用所掌握的经济杠杆对企业形成一定的压力和利益刺激,以诱导企业的生产经营活动。指导性计划应遵循的基本原则主要是:①计划管理的宏观性;②计划的政策导向性;③计划指导范围的合理性;④计划指标体系的科学性。
远景规划一种长期的预测性规划。包含未来发展趋势、基本目标和实施的措施、途径和制定远景规划的基本依据制定远景规划具有重要作用:一是预见性。通过远景规划使人们预见到事物未来发展的大致目标,减少盲目性二是引导性。通过远景规划规范了人们努力的方向,使人们有可能避免决策失误,减少损失。三是激励性。人们通过远景规划,可以看到美好光明的未来,看到将来的利益所在,从而提高信心,积极去为之奋斗。
长期计划计划期在10年以上的国民经济和社会发展计划。长期计划是国民经济和社会发展的纲领性文件,它只是为国民经济和社会发展规定一个远景目标和大致方向,需要通过中、短期计划加以具体化,并分阶段组织实施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。

我要回帖

更多关于 clever怎么读? 的文章

 

随机推荐